Media Contact
Email: [email protected]
Flood Panel is featured in a new digital brochure with National Flood Protection, a national corporate partner.
National Flood Protection LLC is now a member of the American Resort Development Association and will exhibit at ARDA World 2017 in New Orleans, Louisiana from March 26-30, kiosk SK1.
ARDA is a trade association representing the vacation ownership and resort development industries. Its 750 corporate members include privately held firms and publicly traded corporations with extensive experience in shared ownership interests in leisure real estate. The membership also includes timeshare owner associations, resort management companies, industry vendors, suppliers, consultants, and owners through the ARDA Resort Owners Coalition.
“We joined ARDA to partner with an organization whose members own, develop and lease vacation rental property all over the world, many located in flood zones,” said Russ Ellington, president, National Flood Protection. “By exhibiting at ARDA World, we have an opportunity to introduce National Flood Protection to thousands of ARDA members in attendance. We look forward to building relationships with key decision makers who could benefit from our flood mitigation products and services.”
For more information on ARDA World 2017, visit http://www.arda.org/convention/.
Visit https://floodpanel.com/national-flood-protection-llc/ to learn more about National Flood Protection.
The Association of Flood Plain Managers sent the following notice to members about the FEMA Elevation Certificate:
FEMA announced in a March 1 bulletin that the newly revised Elevation Certificate (FEMA form 086-0-33) can now be accessed at: https://www.fema.gov/sites/default/files/2020-07/fema_nfip_elevation-certificate-form-instructions_feb-2020.pdf
Bruce Bender, ASFPM Insurance Committee co-chair, said of the announcement, “After the initial release of the Elevation Certificate, the ASFPM Insurance Committee began gathering feedback about issues users were having. Last October at a Flood Insurance Producers National Committee (FIPNC) meeting, which the Insurance Committee sits on, FEMA stated they were aware of issues with the EC (including a major rounding issue), and were addressing them. The Insurance Committee continued to gather EC issues and ASFPM formally shared them with FEMA in January [2017].”
Bender said, “At the Feb. 28 FIPNC meeting, FEMA announced they were issuing a corrected EC. This reflects some of the recommended changes, including the rounding issue. As you use the Elevation Certificate, please provide any suggested changes or comments to [email protected].”
“One comment received already is that C2.a-h, Section E and G8-G10 forces the entry of two decimal places (whether the data was captured to 2 place-accuracy or not). Section E instructions have been updated to reference the two decimal places (“nearest hundredth”); however, C2 was not,” he said.
“This form expires November 2018. FEMA officials at the FIPNC meeting agreed that it would be good to have industry users ‘test drive’ future forms before officially releasing it,” Bender said.
Commercial contractors should take proactive measures to minimize flood risk before beginning any project. The frequency of flood events and the high cost of floods is driving demand for flood protection and other measures to reduce the probability of catastrophic loss due to flooding.
Before building in flood-prone areas, contractors should take these steps to assess the flood risk and avoid or mitigate the flood threat.
Review flood codes, zones and requirements
Contractors should first contact local building department officials to understand the building code and floodplain management requirements for project sites.
The National Flood Insurance Program requires that structures are designed to prevent flotation, collapse and lateral movement during a flood; flood resistant materials are used; the building is engineered and constructed to minimize flood damage; and HVAC/plumbing equipment is designed or located to prevent water entry.
Communities alter building codes to comply with the updated flood maps and NFIP changes to qualify for federal disaster assistance and flood insurance. State and local ordinances generally follow NFIP requirements plus those set by the state or community.
Other important sources of information include:
Determine the consequences and likelihood of a flood
Flood risk is defined as the potential losses associated with a flood in terms of costs and consequences, expected probability and frequency of event, and exposure to floods. Residual risk is the level of risk not off-set by hazard-resistant design or insurance, such as the continued cost of rebuilding.
Generally, contractors can follow this rule of thumb to assess risk. First, determine the construction/replacement cost per square foot as applied to floodable levels. Then, add the cost of business disruption that includes a realistic period for resumption of operations after a flood.
For projects in flood zones, contractors should consider the likelihood of a flood event over a given time period, the likelihood of frequent and less severe events like nuisance flooding or flash floods, and less frequent, but more severe events such as hurricanes and 100-year floods. At a minimum, commercial contractors should build to standards that prepare for flooding scenarios that may seem unlikely, but actually have a statistical probability of occurrence.
Reduce and manage flood risk
Risk can be reduced or managed physically through flood protection and financially through insurance.
To avoid or manage flood risk, commercial contractors and their clients have few options: move the building outside of the flood zone, elevate the structure above base flood elevation, build earthen barriers like berms, dikes and walls, or floodproof.
Dry floodproofing requires that all large openings have flood barriers, flood panels or flood doors installed, areas below water level must resist infiltration, all small openings must be sealed, buoyancy effects should be considered and a method for pumping out leakage must be provided. FEMA and the NFIP allow dry floodproofing for commercial buildings because relocation or elevation would be a significant business hardship. Furthermore, most commercial structures can’t be elevated, and employees can deploy floodproofing solutions and practice fire-drill style floodproofing deployment plans.
********************